  • Owner: Municipality of Beit Hanoun
  • Location: Beit Hanoun
  • Duration: 2004-2004
  • Type of Services:

    The bridge is 30m long and 13.4m wide, extends over the Wadi at Al Sekka Street. The works included :

    • Analysis of bridge elements using several cases of moving truck loads.
    • Design of bridge deck, beams, girders, piers, pile foundations and retaining walls.
    • Preparing all construction details and project documents.