- Owner: Municipality of Beit Hanoun
- Location: Beit Hanoun
- Duration: 2003 -2003
- Type of Services:
The bridge is 30m long and 19m wide, extends over the Wadi at the main entrance of Beit Hanoun, The works included:
- Analysis of bridge elements using several cases of moving truck loads.
- Design of bridge deck, beams, girders, piers, pile foundations and retaining walls.
- Preparing all construction details and project documents.
- Note: