  • Owner: Municipality of Beit Hanoun
  • Location: Beit Hanoun
  • Duration: 2003 -2003
  • Type of Services:

    The bridge is 30m long and 19m wide, extends over the Wadi at the main entrance of Beit Hanoun, The works included:

    • Analysis of bridge elements using several cases of moving truck loads.
    • Design of bridge deck, beams, girders, piers, pile foundations and retaining walls.
    • Preparing all construction details and project documents.