- Owner: Palestinian Water Authority (PWA) with coordination with CMWU
- Location: Gaza strip
- Duration: 2005-2005
- Type of Services:
The main objective of this consultancy is to conduct and to elaborate a consistent water facility master plan for the water supply and distribution systems of Deir El-Balah Governorate up to year 2025. The planning area embodies: Deir El-Balah, Nusseirat, Maghazi, Zawaida, Bureij, Al-Mussadar and Wadi El-Salqa Municipalities.
Tasks Conducted
- Data collection and review of related works.
- Assessment of the existing water supply and distribution systems of the planning area.
- Identification of the main water supply and distribution problems as well as demand needs.
- Definition of the planning basis and design criteria.
- Conceptual design of the water supply facilities (production and distribution).
- Hydraulic model analysis of the current and future water distribution systems using Water CAD v.7 software.
- Elaboration of a realistic Master Plan based on investment priorities.
- Establish alternative scenarios for the water Master Plan.
- Inventory of specific projects for the implementation of the proposed Master Plan.
- Priority works and packaging for the proposed projects to be implemented.
- Estimate of budget for the implementation of the proposed projects in the Master Plan.
- Preparation of 3-years investment plan for the outputted projects.
- Presentation of the planning schemes, scenarios, and outputs.
- Organization of workshops to present the progress of the project and the results.
- Provide on-job training to the Municipal staff.
- The project was implemented jointly with CEP
- Note: