Close
  • Owner: MA'AN Development Center
  • Location: Gaza Strip
  • Duration: 2018 - 2018
  • Type of Services:

    This assignment aims to identified the environment and social impact assessment (ESIA) in order to ascertain the possible environmental and social impacts of the infrastructural subcomponents (sewer line installation); detail the possible environmental and social impacts of the construction and maintenance works and to manage, mitigate, and monitor any possible negative impacts during the design, construction and operational phases of the project; and where possible enhance positive impacts. The assessment should be carried out in conformity with requirements of the Palestinian Environmental Assessment Policy. The following activities:

    • Provide and lay main UPVC sewer line in the AI Shoka rural roads of a total length 2SS0 m long, the work will include digging the need excavation and backfilling on the sewer line.
    • Conduct maintenance for the toilets and kitchens for 110 Households in AI Shoka and AI Moghraga in order to meet the minimum shelter standards.
    • Installation of 164 house connections to connect the households with the main sanitation system in AI Shoka and AI Moghraga.
  • Note: