Close
  • Owner: SWED Power, Sweden, PEA
  • Location: Gaza
  • Duration: 1998-1999
  • Type of Services:

    PEA is planning to link Gaza to a regional Transmission System. Connecting Gaza networks to the Egyptian Supply system, presently being extended by 220 km into Northern parts of Sinai.

    EMCC has been engaged through SWED Power to perform an Environmental Impact Analysis (EIA) on the transmission system.

    • Data on the environmental baseline, i.e. the present environment characteristics of the study areas.
    • The environment is divided into three main components: The physical, biological and socio–cultural environment.
  • Note: