Close
  • Owner: PWA
  • Location: Beit Lahia
  • Duration: 2007-2007
  • Type of Services:
    • Conduct an environmental screening for the project according to 22 CFR 216 to categorize the project and decide the level of project’s impacts and then the scope of review required. Review of local relevant environmental laws, policies, standards, previous studies are necessary.
    • Prepare the necessary review considering the procedures of the 22 CFR 216 guidelines and prepare monitoring and mitigation plan as appropriate.
    • Write and submit an environmental review report that conforms to USAID regulations and requirements, including a clear description of the steps and procedures that need to be followed during implementation and operation of the project activities.
  • Note: