The following are the key project objectives:
- Developing a profile for water sources utilized by WSPs in the West Bank and Gaza Strip
- Define man made and natural threats and hazards for the WSPs and their water resources
- Define opportunities and adaptation measures at both the sources and WSPs
- Develop a detailed water vulnerability assessment for the WSPs and risk mapping for the water sources that are utilized by WSPs
- Develop a water distribution model/program for bulk supply system and at one of water service providers. This model will be used as a pilot to guide PWA and WSPs on water allocation and water distribution decisions
JV. EMCC and Aqua Consulting Centre
Client: PWA and UNICEF
Year: 2023- 2023.