The assignment included Review of the design and tender documents Construction management and supervision for the construction of three floors (basement and 2 floors). Preparing the final report.
Client:
Imar-Gaza Committee Funded by: co-funding from IDB & The Arab and International Commission to Build Gaza
Year: 2012-2017
The assignment aimed to provide consultancy services to directly supervise the implementation process of the project “Establishing of a HH Sheikh Hamad bin Khalifa Al Thani Rehabilitation and Prosthetics Hospital,” located in the north side of Gaza City. The project’s total area was 12,000 m² included the construction of the main building, which comprised a…
The assignment included preparing detailed design, bill of quantities, and technical specifications of the proposed projects. The following items represented the main components of the project: New Carrier Line Construction Project in Rafah.
New Carrier Line Construction Project in Abasan All-Kabera
Distribution Water Supply Networks Upgrading Project in 6 Areas in Rafah
Client: JICA
Year…
The assignment included conducting “Closure Design & Post-Closure Plan for Deir El-Balah Sanitary Landfill” are to provide the MDLF with: Closure detailed design for Deir Al Balah Sanitary Landfill, Post-closure management plan for Deir Al Balah Sanitary Landfill, The scope of work is divided into four main tasks as follows: Task 1: Desk Review and…
Reconstruction and the redevelopment of Al-Quds hospital, including an overall assessment and a precise evaluation of the repair work of the Technical Unit. part under the Cultural Center of the PRCS building. Tasks of the Consultant: • Surveying the physical damages and confirming the viability of the building,
• Appraise the physical work to…
The dumpsite was reshaped into a more stable shape, with an extension of the footprint into a rectangular shape occupying an area of approximately 40,000 square meters at the base; with such extension allowing reduction of side slopes into a safer shape. The existing dumpsite was completely closed in front of any incoming solid waste,…