Skip to content Skip to sidebar Skip to footer

Assessment and Rehabilitation for PIEDCO Warehouses PADICO through its subsidiaries, PRICO Operations and Maintenance

The project is aimed to conduct a structural assessment for hangers No. 96 & hanger 95, which have been directly affected by the blast and the fire in the neighbored hangers, and prepare the tender documents for rehabilitation works. A typical assessment process utilizing established assessment methods would include some or all of the following…

Read More

Outpatient clinics at El Shifa hospital

The project included the design of a new building for outpatient clinics at Al-Shifa Hospital. The proposed building comprises two floors with a total area of 1,900 square meters.  The following tasks are carried out: Conducting a preliminary site study, including comprehensive surveying and soil testing activities. Developing detailed designs and plans for architectural, structural,…

Read More

An Assessment and Emergency Plan for the Random Collected and Disposed Solid Wastes in the Gaza Strip

The assignment included assessing the current situation, identifying and assessing the gaps, developing a comprehensive emergency plan, proposing actionable short and mid-term/practical solutions, and recommending effective measures for handling or disposing of the solid waste generated from the temporary shelters in Gaza Strip. Also, offer recommendations for capacity building and resource allocation for JSCs and…

Read More

Baseline assessment to document and analyze vulnerability in municipal and infrastructure services in target areas in Gaza strip

The required tasks that were achieved during the course of the assignment in consultation with MDLF are: Develop a baseline methodology for the assessment. Design tools/questionnaire and methodology for data collection of both qualitative and quantitative data. The assigned tasks as per the TOR aim to gather data related to the identified SMART (Specific, Measurable,…

Read More