The required tasks that were achieved during the course of the assignment in consultation with MDLF are: Develop a baseline methodology for the assessment.
Design tools/questionnaire and methodology for data collection of both qualitative and quantitative data. The assigned tasks as per the TOR aim to gather data related to the identified SMART (Specific, Measurable,…
The following are the key project objectives: Developing a profile for water sources utilized by WSPs in the West Bank and Gaza Strip
Define man made and natural threats and hazards for the WSPs and their water resources
Define opportunities and adaptation measures at both the sources and WSPs
Develop a detailed water vulnerability assessment…
Detailed Design and construction supervision for the second and the third floor of El Awda Hospital, including the following:
Modified architectural drawings.
Flooring details.
Partition details.
Ceiling details.
Doors and windows details.
Heating, ventilation, and central air conditioning.
Medical gas
pluming system
Nurse call system.
Lighting system.
Power installations.
Communication system.
Security system.
CCTV system.
Fire…
Al-Rasheed Street is the only costal road which extends from north to south of Gaza strip. The works include Infrastructure works (Water works, Sewer works, roads works, Electrical works, Communication works, Traffic works, road painting, safety works, agriculture works. Tasks of Consultant Review project designs. Supervising the work carried out. Review the shop drawings. Review…
Tasks conducted Participate in the selection of shortlisted companies and freelancers (Graduates). Implement the training program to the highest achievable standards. Provide the following for each training course:
List of participants
Agenda (Course outline)
Training Material Provide monitoring and quality control for the taught materials and the process of delivery. Conduct pre and post…
Developing “O & M” plan and web-based monitoring system for public WASH facilities in the Gaza Strip
The specific objectives of this assignment were: conducted assessment and evaluation of the condition of each WASH facility, the assessment shall include:
Technical Assessment: includes, but not limited to, the extent of defects in all equipment, assets, building, and surrounding area, and the relevance of defects in relation to WASH facility performing in its intended…
