The following are the key project objectives: Developing a profile for water sources utilized by WSPs in the West Bank and Gaza Strip
Define man made and natural threats and hazards for the WSPs and their water resources
Define opportunities and adaptation measures at both the sources and WSPs
Develop a detailed water vulnerability assessment…
Detailed Design and construction supervision for the second and the third floor of El Awda Hospital, including the following:
Modified architectural drawings.
Flooring details.
Partition details.
Ceiling details.
Doors and windows details.
Heating, ventilation, and central air conditioning.
Medical gas
pluming system
Nurse call system.
Lighting system.
Power installations.
Communication system.
Security system.
CCTV system.
Fire…
Al-Rasheed Street is the only costal road which extends from north to south of Gaza strip. The works include Infrastructure works (Water works, Sewer works, roads works, Electrical works, Communication works, Traffic works, road painting, safety works, agriculture works. Tasks of Consultant Review project designs. Supervising the work carried out. Review the shop drawings. Review…
Developing “O & M” plan and web-based monitoring system for public WASH facilities in the Gaza Strip
The specific objectives of this assignment were: conducted assessment and evaluation of the condition of each WASH facility, the assessment shall include:
Technical Assessment: includes, but not limited to, the extent of defects in all equipment, assets, building, and surrounding area, and the relevance of defects in relation to WASH facility performing in its intended…
Housing sector, implemented by UNRWA, Al-Rahma, Palestinian Housing Council, Qatar Charity, Human Appeal International and Imar-Gaza: Rehabilitation of 5000 house for the partially damaged houses. Re-construction of 3384 house for fully damaged houses in the Gaza war. Reconstruction of 2400 homes for the poor and the handicapped. Rehabilitation of Al-Andalus residential tower. Establishing of the…
This project was assigned to the joint venture of Antea Group/EMCC/ Engicon to carry out this study. Al Fukhari Sanitary Landfill is intended to accept 152,000 m3 of municipal solid waste (MSW) per year during the initial operation period, growing to 212,000 m3 per year in 2017. Al Fukhari Landfill is expected to provide solid…
