Rehabilitation of Al Namsawi Dumpsite at Khan Younis

The assignment included developing an environmentally sound and cost-effective detailed design for the Rehabilitation of the Al Namsawi dumpsite at Khan Younis with final design drawings, construction details, cross-sections, quantities, cost estimation, ESMP, technical specifications, and tender documents in addition to high-quality supervision and contract management. The scope of work is divided into two main…

Read More

An Assessment and Emergency Plan for the Random Collected and Disposed Solid Wastes in the Gaza Strip

The assignment included assessing the current situation, identifying and assessing the gaps, developing a comprehensive emergency plan, proposing actionable short and mid-term/practical solutions, and recommending effective measures for handling or disposing of the solid waste generated from the temporary shelters in Gaza Strip. Also, offer recommendations for capacity building and resource allocation for JSCs and…

Read More

Gaza Solid Waste Management Project (Al Fukhari Sanitary Landfill)

This project was assigned to the joint venture of Antea Group/EMCC/ Engicon to carry out this study. Al Fukhari Sanitary Landfill is intended to accept 152,000 m3 of municipal solid waste (MSW) per year during the initial operation period, growing to 212,000 m3 per year in 2017. Al Fukhari Landfill is expected to provide solid…

Read More

Solid Waste Transfer Stations “Middle Area and Rafah Governorates – Gaza Strip

The assignment utilized and referred to the project’s Feasibility Study and Detailed Design and the Environmental and Social Impact Assessment (ESIA) conducted in 2012, and considered the standard design elements for both siting and detailed design of respective transfer stations, in addition to any specific requirement that may arise by the operator, including the following:…

Read More