Skip to content Skip to sidebar Skip to footer

Redesign of two elements (admin building & embankments) in Wadi Gaza

The assignment included reviewing, redesign and propose needed modifications on the original designs, BOQs, drawings, specifications, cost estimations, design reports and all other tender documents, by utilizing the green building criteria. The elements are as follows: 2D Flood assessment modelling for Wadi Gaza Embankments including the green pedestrian walkway and the solar renewable energy for…

Read More

Vulnerability Assessment of Public Water Supply sources and Public Water Supply Risk Mapping in the West Bank and Gaza Strip

The following are the key project objectives: Developing a profile for water sources utilized by WSPs in the West Bank and Gaza Strip Define man made and natural threats and hazards for the WSPs and their water resources Define opportunities and adaptation measures at both the sources and WSPs Develop a detailed water vulnerability assessment…

Read More