Reconstruction and the redevelopment of Al-Quds hospital, including an overall assessment and a precise evaluation of the repair work of the Technical Unit. part under the Cultural Center of the PRCS building. Tasks of the Consultant: • Surveying the physical damages and confirming the viability of the building,
• Appraise the physical work to…
Design and Preparation of tender documents for the rehabilitation works of the PRCS 12 story building, The objectives of this assignment were: Architectural design and furnishing layout.
Design of rehabilitation civil works.
Design of electrical works and extensions.
Mechanical works (plumbing and HVAC).
All finishing works. The project was conducted jointly with Rai-Consult Client: The…
The project is aimed to conduct a structural assessment for hangers No. 96 & hanger 95, which have been directly affected by the blast and the fire in the neighbored hangers, and prepare the tender documents for rehabilitation works. A typical assessment process utilizing established assessment methods would include some or all of the following…
The required tasks that were achieved during the course of the assignment in consultation with MDLF are: Develop a baseline methodology for the assessment.
Design tools/questionnaire and methodology for data collection of both qualitative and quantitative data. The assigned tasks as per the TOR aim to gather data related to the identified SMART (Specific, Measurable,…
Detailed Design and construction supervision for the second and the third floor of El Awda Hospital, including the following:
Modified architectural drawings.
Flooring details.
Partition details.
Ceiling details.
Doors and windows details.
Heating, ventilation, and central air conditioning.
Medical gas
pluming system
Nurse call system.
Lighting system.
Power installations.
Communication system.
Security system.
CCTV system.
Fire…
