The project comprised the design of the collection system for Kerbit Al Adas and Al Forkan areas, the design of the Aslan stormwater pond, the preparation of the sewage master plan for Wadi Al Salqa, and the updating of the stormwater master plan for Khan Younis city, in addition to the design of one pumping station and the review of another one with pressure lines. The following were the main activities of the consultancy work:
- Design of Wastewater Network at Kerbit Al Adas Area-Rafah and revise the existing design of the SPS.
- Design of Wastewater Network, Pumping Station and Pressure Line at Al Forkan Area – Rafah.
- Design of Aslan Storm Water Pond- Beit Lahia.
- Prepare Sewage Master Plan for Wadia Al Salqa Municipal Area.
- Updating the Old Master Plan of Storm Water System At Khan Younis City.
Client:
CMWU
Year: 2017-2017