Skip to content Skip to sidebar Skip to footer

Monitoring and Supervision of Islamic Development Bank Projects implemented by NGOs.

Housing sector, implemented by UNRWA, Al-Rahma, Palestinian Housing Council, Qatar Charity, Human Appeal International and Imar-Gaza:

  • Rehabilitation of 5000 house for the partially damaged houses.
  • Re-construction of 3384 house for fully damaged houses in the Gaza war.
  • Reconstruction of 2400 homes for the poor and the handicapped.
  • Rehabilitation of Al-Andalus residential tower.
  • Establishing of the Tal El Sultan housing project in Rafah.
  • Construction of the Tal El-Hawa housing project Phase I.
  • Construction of the Tal El-Hawa housing project Phase II.
  • Construction of Tal Al – Hawa Housing Project Phase III.
  • Construction of the Engineers housing in Rafah.

Education sector, implemented by UNESCO, UNRWA, Islamic Relief, Qatar Charity and Human Appeal International, BECDARE:

  • Rehabilitation of schools and rubble removal as well as providing education facilities with required instruments and devices.
  • Rehabilitation of damaged universities and faculties facilities.
  • Rehabilitation 150 schools and adding more than 190 new classrooms.
  • Construction 44 new schools and furnishing 35.
  • Equipped 110 computer labs in schools.
  • Rehabilitation 7 center for vocational training.
  • Reconstruction the laboratory building at the Islamic University of Gaza, Rehabilitation university premises and supply of laboratory equipment.
  • Construction of Kuwaiti Technology Incubator / Educational Center.
  • Support universities sciences’ laboratories with instruments and devices.
  • Providing food supplements to schools students and orphanages.

Health sector, implemented by UNRWA, Islamic Relief, WHO, QRC, Qatar Charity, Human Appeal International, and Imar-Gaza:

  • Rehabilitation MoH hospitals and PHCs.
  • Sponsoring numerous critical surgeries in the Gaza Strip, done by surgeons visiting from around the globe.
  • Supply MOH Hospitals with devices, instruments, drugs and medical equipment as well as mobile clinics.
  • Damages rehabilitation for MOH hospitals and primary care centers.
  • Establishment of Neurosurgery Department – European Hospital – Gaza Strip.
  • Providing interventional catheterization tools and devices for department of Cardiac Catheterization – European Hospital – Gaza Strip.
  • Rehabilitation of Al-Quds Hospital.
  • Construction of Deir Al-Balah Hospital.
  • Al-Aqsa physicians crews for mental support and training.
  • Completion of construction and finishing the Specialist surgery building in Al-Shifa Hospital.
  • Completion of construction and finishing the building C. in Nasser Hospital
  • Construction a pediatric and obstetric hospital in Deir Al-Balah.
  • Rehabilitation 12 different hospitals in the Gaza Strip, adding additional floors to a number of hospitals and installation of lifts therein.
  • Rehabilitation 50 MoH primary health care centers and building a new UNRWA one.
  • Providian medical apparatus, spare parts, pharmaceuticals and consumables.
  • Supporting the delegation of consultants to the Gaza Strip, to conduct key surgeries.

Agriculture sector, implemented by UNDP, Qatar Charity, TRC, Islamic Relief, Al-Rahma and welfare:

  • Re-cultivation of 10,000 Dunam with vegetables for upcoming cultivation seasons, and rehabilitation of 4,000 Dunam of vegetables greenhouses as well as rehabilitation of 5,000 greenhouses.
  • Rehabilitation of 150 fish boats and perform training programs for 40 fisherman including boats carpentry and mechanical works.
  • Supply the local fishermen with fishing tools.
  • Construction of 60 fishermen rooms in Gaza, Khanyounes and Rafah ports.
  • Supply more 2,000 farmers with production inputs including chickens, cows, feed, medicines and Veterinary Services.
  • Supply more than 46,000 animals (chickens, sheep and cows) for local farmers in Gaza strip, through financing micro and small-scale projects

Municipalities & Public Works, Water and wastewater sector, implemented by CMWU, UNDP, UNRWA, ImarGaza ,PECDAR and QRC:

  • Removal of hazardous rubbles, and reopening rubble blocked roads resulted from wars on Gaza.
  • Construction of Wadi Gaza Bridge – Western side.
  • Rehabilitation of Several roads in Gaza Strip.
  • Supply Gaza strip Municipalities with devices, instruments, and solid waste equipment.
  • Construction of solid waste transfer stations in Gaza and Khanyounes.
  • Rehabilitation of (80 km) Roads, including the coastal road, part of Salah Al-Din Rd., and many other internal roads in the Gaza Strip.
  • Re-Construction of (35 km) Roads in the Gaza Strip.
  • Rehabilitation Rafah crossing point.
  • Transported solid waste from random sites, supplied equipment and built a solid waste transfer station in Khan Younis.
  • Rebuilt destroyed municipal buildings and premises.

Improvement of Water and Wastewater Services in Gaza Strip, this project includes:

  • Construction of Wastewater Treatment Plant in Khan Younis.
  • Construction of water desalination station in Gaza (city).
  • Construction of many rainwater infiltration projects in the Gaza Strip.
  • Construction of infiltration basin in al Amal area in khan Younis city.
  • Construction of infiltration basin in Asquola yard in Gaza city.
  • Built many infiltration projects in many of schools and roads.
  • Construction of several tanks in Gaza strip (Deir Al-Balah, Bani Suhaila, and Al- Mograga).
  • Rehabilitation, developed water pump and desalination stations.
  • Rehabilitation, developed wastewater pump stations, networks and built new wastewater pump station.
  • Supplied fuel and consumables.
  • Rehabilitation water wells and networks.
  • Built water storage and pump stations.
  • Built a water quality control lab and a maintenance workshop.
  • Maintenance of Water Wells and partial parts of wastewater networks in Gaza strip, this project includes:
  • Rehabilitation and construction of wastewater networks in Rafah, Middle Area and North Area.
  • Drilling and Construction of Al Marwa and Khadeja Wells.
  • Drilling and Construction of Al Omary wells and maintenance of Ghaben and Al Atatra Wells.
  • Operation of Al Thohairat well.
  • Construction of Pumping Station and carrier line in Rafah Area.
  • Construction of Electricity networks to operate wells in Rafah and Khanyounis.
  • Construction of wastewater network in Khanyounis.

Industry Sector, implemented by Palestinian Federation of Industries, Qatar Charity and Imar Gaza.

  • Assessed 400 facilities damaged in the 2008 war and 65 facilities in the 2012 war.
  • Rehabilitation 400 industrial facilities.

Social Sector implemented by, UNRWA, Qatar Charity, Islamic Relief, QRC and UNDP:

  • Trained youth on SYB.
  • Supported productive households through financing small-scale projects.
  • Supported employment of fresh university graduates in universities, colleges and schools.
  • Built a car maintenance workshop.
  • Supported the handicapped through numerous activities, including psychosocial support.
  • Built a unit for the “Arabization” of sciences.
  • Support to “productive” households through financing micro and small-scale projects

Electricity sector, implemented by PNERA and UNDP:

  • Supply and installation of voltage transformers to improve the performance of Gaza electricity power station.
  • Rehabilitation of electricity distribution lines in damaged area and perform installation works as well as civil works to connect various areas in Gaza city.
  • Supply and installation an electricity network and voltage transformers in Gaza and North Gaza

Follow–up and reporting of a number of projects implemented by Palestinian institutions including:

  • Ministry of Education (11 projects)
  • Ministry of Public Works (182 projects)
  • Ministry of Health (8 projects)
  • Ministry of Supply (1 project)
  • Ministry of Agriculture (4 projects)
  • Ministry of local governments (12 projects)
  • Ministry of Economy (1 project)
  • Palestinian Housing Council (3 projects)
  • Islamic University– Gaza (1 project)
  • Al-Azhar University– Gaza (1 project)
  • Al-Quds Open University– Gaza (1 project)
  • Al-Wafa’ Society (4 projects)
  • FETA Center (1 project)

Client:

Islamic Development Bank

Funded by:

Al-Aqsa Fund, Al Quds Fund and GCC program

 Year: 2001 – present