Housing sector, implemented by UNRWA, Al-Rahma, Palestinian Housing Council, Qatar Charity, Human Appeal International and Imar-Gaza:
- Rehabilitation of 5000 house for the partially damaged houses.
- Re-construction of 3384 house for fully damaged houses in the Gaza war.
- Reconstruction of 2400 homes for the poor and the handicapped.
- Rehabilitation of Al-Andalus residential tower.
- Establishing of the Tal El Sultan housing project in Rafah.
- Construction of the Tal El-Hawa housing project Phase I.
- Construction of the Tal El-Hawa housing project Phase II.
- Construction of Tal Al – Hawa Housing Project Phase III.
- Construction of the Engineers housing in Rafah.
Education sector, implemented by UNESCO, UNRWA, Islamic Relief, Qatar Charity and Human Appeal International, BECDARE:
- Rehabilitation of schools and rubble removal as well as providing education facilities with required instruments and devices.
- Rehabilitation of damaged universities and faculties facilities.
- Rehabilitation 150 schools and adding more than 190 new classrooms.
- Construction 44 new schools and furnishing 35.
- Equipped 110 computer labs in schools.
- Rehabilitation 7 center for vocational training.
- Reconstruction the laboratory building at the Islamic University of Gaza, Rehabilitation university premises and supply of laboratory equipment.
- Construction of Kuwaiti Technology Incubator / Educational Center.
- Support universities sciences’ laboratories with instruments and devices.
- Providing food supplements to schools students and orphanages.
Health sector, implemented by UNRWA, Islamic Relief, WHO, QRC, Qatar Charity, Human Appeal International, and Imar-Gaza:
- Rehabilitation MoH hospitals and PHCs.
- Sponsoring numerous critical surgeries in the Gaza Strip, done by surgeons visiting from around the globe.
- Supply MOH Hospitals with devices, instruments, drugs and medical equipment as well as mobile clinics.
- Damages rehabilitation for MOH hospitals and primary care centers.
- Establishment of Neurosurgery Department – European Hospital – Gaza Strip.
- Providing interventional catheterization tools and devices for department of Cardiac Catheterization – European Hospital – Gaza Strip.
- Rehabilitation of Al-Quds Hospital.
- Construction of Deir Al-Balah Hospital.
- Al-Aqsa physicians crews for mental support and training.
- Completion of construction and finishing the Specialist surgery building in Al-Shifa Hospital.
- Completion of construction and finishing the building C. in Nasser Hospital
- Construction a pediatric and obstetric hospital in Deir Al-Balah.
- Rehabilitation 12 different hospitals in the Gaza Strip, adding additional floors to a number of hospitals and installation of lifts therein.
- Rehabilitation 50 MoH primary health care centers and building a new UNRWA one.
- Providian medical apparatus, spare parts, pharmaceuticals and consumables.
- Supporting the delegation of consultants to the Gaza Strip, to conduct key surgeries.
Agriculture sector, implemented by UNDP, Qatar Charity, TRC, Islamic Relief, Al-Rahma and welfare:
- Re-cultivation of 10,000 Dunam with vegetables for upcoming cultivation seasons, and rehabilitation of 4,000 Dunam of vegetables greenhouses as well as rehabilitation of 5,000 greenhouses.
- Rehabilitation of 150 fish boats and perform training programs for 40 fisherman including boats carpentry and mechanical works.
- Supply the local fishermen with fishing tools.
- Construction of 60 fishermen rooms in Gaza, Khanyounes and Rafah ports.
- Supply more 2,000 farmers with production inputs including chickens, cows, feed, medicines and Veterinary Services.
- Supply more than 46,000 animals (chickens, sheep and cows) for local farmers in Gaza strip, through financing micro and small-scale projects
Municipalities & Public Works, Water and wastewater sector, implemented by CMWU, UNDP, UNRWA, ImarGaza ,PECDAR and QRC:
- Removal of hazardous rubbles, and reopening rubble blocked roads resulted from wars on Gaza.
- Construction of Wadi Gaza Bridge – Western side.
- Rehabilitation of Several roads in Gaza Strip.
- Supply Gaza strip Municipalities with devices, instruments, and solid waste equipment.
- Construction of solid waste transfer stations in Gaza and Khanyounes.
- Rehabilitation of (80 km) Roads, including the coastal road, part of Salah Al-Din Rd., and many other internal roads in the Gaza Strip.
- Re-Construction of (35 km) Roads in the Gaza Strip.
- Rehabilitation Rafah crossing point.
- Transported solid waste from random sites, supplied equipment and built a solid waste transfer station in Khan Younis.
- Rebuilt destroyed municipal buildings and premises.
Improvement of Water and Wastewater Services in Gaza Strip, this project includes:
- Construction of Wastewater Treatment Plant in Khan Younis.
- Construction of water desalination station in Gaza (city).
- Construction of many rainwater infiltration projects in the Gaza Strip.
- Construction of infiltration basin in al Amal area in khan Younis city.
- Construction of infiltration basin in Asquola yard in Gaza city.
- Built many infiltration projects in many of schools and roads.
- Construction of several tanks in Gaza strip (Deir Al-Balah, Bani Suhaila, and Al- Mograga).
- Rehabilitation, developed water pump and desalination stations.
- Rehabilitation, developed wastewater pump stations, networks and built new wastewater pump station.
- Supplied fuel and consumables.
- Rehabilitation water wells and networks.
- Built water storage and pump stations.
- Built a water quality control lab and a maintenance workshop.
- Maintenance of Water Wells and partial parts of wastewater networks in Gaza strip, this project includes:
- Rehabilitation and construction of wastewater networks in Rafah, Middle Area and North Area.
- Drilling and Construction of Al Marwa and Khadeja Wells.
- Drilling and Construction of Al Omary wells and maintenance of Ghaben and Al Atatra Wells.
- Operation of Al Thohairat well.
- Construction of Pumping Station and carrier line in Rafah Area.
- Construction of Electricity networks to operate wells in Rafah and Khanyounis.
- Construction of wastewater network in Khanyounis.
Industry Sector, implemented by Palestinian Federation of Industries, Qatar Charity and Imar Gaza.
- Assessed 400 facilities damaged in the 2008 war and 65 facilities in the 2012 war.
- Rehabilitation 400 industrial facilities.
Social Sector implemented by, UNRWA, Qatar Charity, Islamic Relief, QRC and UNDP:
- Trained youth on SYB.
- Supported productive households through financing small-scale projects.
- Supported employment of fresh university graduates in universities, colleges and schools.
- Built a car maintenance workshop.
- Supported the handicapped through numerous activities, including psychosocial support.
- Built a unit for the “Arabization” of sciences.
- Support to “productive” households through financing micro and small-scale projects
Electricity sector, implemented by PNERA and UNDP:
- Supply and installation of voltage transformers to improve the performance of Gaza electricity power station.
- Rehabilitation of electricity distribution lines in damaged area and perform installation works as well as civil works to connect various areas in Gaza city.
- Supply and installation an electricity network and voltage transformers in Gaza and North Gaza
Follow–up and reporting of a number of projects implemented by Palestinian institutions including:
- Ministry of Education (11 projects)
- Ministry of Public Works (182 projects)
- Ministry of Health (8 projects)
- Ministry of Supply (1 project)
- Ministry of Agriculture (4 projects)
- Ministry of local governments (12 projects)
- Ministry of Economy (1 project)
- Palestinian Housing Council (3 projects)
- Islamic University– Gaza (1 project)
- Al-Azhar University– Gaza (1 project)
- Al-Quds Open University– Gaza (1 project)
- Al-Wafa’ Society (4 projects)
- FETA Center (1 project)
Client:
Islamic Development Bank
Funded by:
Al-Aqsa Fund, Al Quds Fund and GCC program
Year: 2001 – present