Skip to content Skip to sidebar Skip to footer

Sewage Pump Station & Wastewater Network for Swidish Camp

The assignment included the following:

  • Design of a sewage pumping station 500 m3 / day capacity
  • Design of 2 KM Force main from the PS to the existing sewage system near UNDP roundabout.
  • Design of 2.5 KM of UPVC pipes and manholes with different diameters

Client:

Palestinian Water Authority (PWA)

Year: 2021-2022