Skip to content Skip to sidebar Skip to footer

Redesign of two elements (admin building & embankments) in Wadi Gaza by utilizing the eco-friendly building criteria

the assignment included reviewing, redesign and propose needed modifications on the original designs, BOQs, drawings, specifications, cost estimations, design reports and all other tender documents, by utilizing the green building criteria.

The elements are as follows:

2D Flood assessment modelling for Wadi Gaza

Eco-friendly administration building for the Joint Service Council for Wadi Gaza (JSC-WG), including solar renewable energy system for the admin building and lighting poles surrounding the admin building.

Embankments including the green pedestrian walkway and the solar renewable energy for the lighting poles in the embankments area.

Client: UNDP
Year: 2023 – The design of Admin building was completed while the embankment was partially completed due to war

Office

AL Omara Bldg ــ
AL Thawra str, Gaza, Palestine

Newsletter

EMCC © 2025. All Rights Reserved.