Skip to content Skip to sidebar Skip to footer

Al Awda Hospital – Rehabilitation of Two Floors at the New Building

Detailed Design and construction supervision for the second and the third floor of El Awda Hospital, including the following:

    1. Modified architectural drawings.
    2. Flooring details.
    3. Partition details.
    4. Ceiling details.
    5. Doors and windows details.
    6. Heating, ventilation, and central air conditioning.
    7. Medical gas 
    8. pluming system
    9. Nurse call system.
    10. Lighting system.
    11. Power installations.
    12. Communication system.
    13. Security system.
    14. CCTV system.
    15. Fire alarm system.
    16. Earthing system.
    17. Final tender documents.
    18. Participating in the tendering process and the selection of the construction company.
    19. Managing the project and supervising construction.

Client:

Médecins Sans Frontières – MSF (Belgium)

Year : 2019 – 2019

Leave a comment