The assignment utilized and referred to the project’s Feasibility Study and Detailed Design and the Environmental and Social Impact Assessment (ESIA) conducted in 2012, and considered the standard design elements for both siting and detailed design of respective transfer stations, in addition to any specific requirement that may arise by the operator, including the following:…
