Skip to content Skip to sidebar Skip to footer

Rehabilitation of Al Namsawi Dumpsite at Khan Younis

The assignment included developing an environmentally sound and cost-effective detailed design for the Rehabilitation of the Al Namsawi dumpsite at Khan Younis with final design drawings, construction details, cross-sections, quantities, cost estimation, ESMP, technical specifications, and tender documents in addition to high-quality supervision and contract management. The scope of work is divided into two main…

Read More

Rafah Transportation Master Plan 2030

Natuf implemented this project for development in conjunction with EMCC. Rafah Transportation Master Plan produced a strategic plan for the traffic system and transportation facilities in Rafah Governorate up to 2030. Comprehensive data collection and data analysis was conducted followed by planning and preparing an awareness plan to ensure public acceptance and cooperation with the…

Read More

Development of Al Nasr Street

Rehabilitation of Al Nasr Street (2.6 km), including: Storm water Box Culvert, Sewage lines and Water supply networks. Electricity and Telephone networks. Water supply pipelines. Interlock pavement. Site supervision. Client: Municipality of Gaza, Ministry of Local Government Funded by: Arab Bank for Economic Development in Africa‏ through the Islamic Development Bank Year: 2007 – 2011…

Read More

Update the Status of the Drinking Water Sector in the Gaza Strip

The assignment included providing an update on the status of the drinking water being produced by desalination plants in the Gaza Strip. In essence, this assignment will provide an update to the 2015 report about the Survey of Private and Public Brackish Desalination Plants in the Gaza Strip. The consultant task as summarized below: Updating…

Read More