Skip to content Skip to sidebar Skip to footer

An Assessment and Emergency Plan for the Random Collected and Disposed Solid Wastes in the Gaza Strip

The assignment included assessing the current situation, identifying and assessing the gaps, developing a comprehensive emergency plan, proposing actionable short and mid-term/practical solutions, and recommending effective measures for handling or disposing of the solid waste generated from the temporary shelters in Gaza Strip. Also, offer recommendations for capacity building and resource allocation for JSCs and…

Read More

Vulnerability Assessment of Public Water Supply sources and Public Water Supply Risk Mapping in the West Bank and Gaza Strip

The following are the key project objectives: Developing a profile for water sources utilized by WSPs in the West Bank and Gaza Strip Define man made and natural threats and hazards for the WSPs and their water resources Define opportunities and adaptation measures at both the sources and WSPs Develop a detailed water vulnerability assessment…

Read More

Al Awda Hospital – Rehabilitation of Two Floors at the New Building

Detailed Design and construction supervision for the second and the third floor of El Awda Hospital, including the following: Modified architectural drawings. Flooring details. Partition details. Ceiling details. Doors and windows details. Heating, ventilation, and central air conditioning. Medical gas  pluming system Nurse call system. Lighting system. Power installations. Communication system. Security system. CCTV system. Fire…

Read More

Reconstruction of Al- Rasheed Road in Gaza strip (package 1 & 3 & 10)

Al-Rasheed Street is the only costal road which extends from north to south of Gaza strip.  The works include Infrastructure works (Water works, Sewer works, roads works, Electrical works, Communication works, Traffic works, road painting, safety works, agriculture works. Tasks of Consultant Review project designs. Supervising the work carried out. Review the shop drawings. Review…

Read More