Rehabilitation of Al Nasr Street (2.6 km), including: Storm water Box Culvert, Sewage lines and Water supply networks.
Electricity and Telephone networks.
Water supply pipelines.
Interlock pavement.
Site supervision. Client:…
The project comprised the design of the collection system for Kerbit Al Adas and Al Forkan areas, the design of the Aslan stormwater pond, the preparation of the sewage master…
The assignment included providing an update on the status of the drinking water being produced by desalination plants in the Gaza Strip. In essence, this assignment will provide an update…
The assignment included the following: Design of a sewage pumping station 500 m3 / day capacity
Design of 2 KM Force main from the PS to the existing sewage system…
The specific objectives of this assignment were: Data gathering – Physical Survey’s and Desktop based
Local logistics and arrangements for Expat site visits
Local coordination with project stakeholders
Support and…
The assignment included:
The intervention in Abu Rashed stormwater pond located in Jabalia Camp includes the rehabilitation of the drainage system, and increasing the depth of the pond by 1.5…