The project included the design of a new building for outpatient clinics at Al-Shifa Hospital. The proposed building comprises two floors with a total area of 1,900 square meters. The…
The assignment included assessing the current situation, identifying and assessing the gaps, developing a comprehensive emergency plan, proposing actionable short and mid-term/practical solutions, and recommending effective measures for handling or…
The project included the design and supervision of the PV system for the administration building and workshop building with a total capacity of 30 KW system Client: Municipal Development and…
The assignment included the supply and installation of Solar panels for Seven Women enterprises in the Gazs Strip. The design package included: Site investigation, and technical assessment of the existing…
The required tasks that were achieved during the course of the assignment in consultation with MDLF are: Develop a baseline methodology for the assessment.
Design tools/questionnaire and methodology for data…
The following are the key project objectives: Developing a profile for water sources utilized by WSPs in the West Bank and Gaza Strip
Define man made and natural threats and…