The assignment included assessing the current situation, identifying and assessing the gaps, developing a comprehensive emergency plan, proposing actionable short and mid-term/practical solutions, and recommending effective measures for handling or…
The project included the design and supervision of the PV system for the administration building and workshop building with a total capacity of 30 KW system Client: Municipal Development and…
The assignment included the supply and installation of Solar panels for Seven Women enterprises in the Gazs Strip. The design package included: Site investigation, and technical assessment of the existing…
The required tasks that were achieved during the course of the assignment in consultation with MDLF are: Develop a baseline methodology for the assessment.
Design tools/questionnaire and methodology for data…
The following are the key project objectives: Developing a profile for water sources utilized by WSPs in the West Bank and Gaza Strip
Define man made and natural threats and…
Detailed Design and construction supervision for the second and the third floor of El Awda Hospital, including the following:
Modified architectural drawings.
Flooring details.
Partition details.
Ceiling details.
Doors and windows…