The assignment included reviewing, redesign and propose needed modifications on the original designs, BOQs, drawings, specifications, cost estimations, design reports and all other tender documents, by utilizing the green building criteria.
The elements are as follows:
2D Flood assessment modelling for Wadi Gaza
Embankments including the green pedestrian walkway and the solar renewable energy for the lighting poles in the embankments area.
Eco-friendly administration building for the Joint Service Council for Wadi Gaza (JSC-WG), including solar renewable energy system for the admin building and lighting poles surrounding the admin building.
Client: UNDP
Year: 2023