The assignment included the detailed design for the overall PV solar energy system at estimated 7 MWp capacity for KY WWTP, phase I, and tender documents for the different phases/packages. Also, the consultant provided technical assistance services for the construction, commissioning and handing over of the first phase of this solar energy system with a…
The following are the key project objectives: Developing a profile for water sources utilized by WSPs in the West Bank and Gaza Strip
Define man made and natural threats and hazards for the WSPs and their water resources
Define opportunities and adaptation measures at both the sources and WSPs
Develop a detailed water vulnerability assessment…
