Skip to content Skip to sidebar Skip to footer

Monitoring and Supervision of Islamic Development Bank Projects implemented by NGOs.

Housing sector, implemented by UNRWA, Al-Rahma, Palestinian Housing Council, Qatar Charity, Human Appeal International and Imar-Gaza: Rehabilitation of 5000 house for the partially damaged houses. Re-construction of 3384 house for fully damaged houses in the Gaza war. Reconstruction of 2400 homes for the poor and the handicapped. Rehabilitation of Al-Andalus residential tower. Establishing of the…

Read More

Gaza Solid Waste Management Project (Al Fukhari Sanitary Landfill)

This project was assigned to the joint venture of Antea Group/EMCC/ Engicon to carry out this study. Al Fukhari Sanitary Landfill is intended to accept 152,000 m3 of municipal solid waste (MSW) per year during the initial operation period, growing to 212,000 m3 per year in 2017. Al Fukhari Landfill is expected to provide solid…

Read More

Al Amal City for Sheikh Hamad Bin Khalifa Al-Thani

Detailed Design and Supervision of Al Amal City for Sheikh Hamad Bin Khalifa Al-Thani  (110 Dunums). The components included:  School + kindergarten a total area of 6.9 Dunums. Residential buildings total area of 55 Dunums. Green areas – 14.02 Dunums. Infrastructure and all roads with total area 27.5 Dunums. Client: State of Qatar Year :…

Read More

Solid Waste Transfer Stations “Middle Area and Rafah Governorates – Gaza Strip

The assignment utilized and referred to the project’s Feasibility Study and Detailed Design and the Environmental and Social Impact Assessment (ESIA) conducted in 2012, and considered the standard design elements for both siting and detailed design of respective transfer stations, in addition to any specific requirement that may arise by the operator, including the following:…

Read More

Redesign of two elements (admin building & embankments) in Wadi Gaza

The assignment included reviewing, redesign and propose needed modifications on the original designs, BOQs, drawings, specifications, cost estimations, design reports and all other tender documents, by utilizing the green building criteria. The elements are as follows: 2D Flood assessment modelling for Wadi Gaza Embankments including the green pedestrian walkway and the solar renewable energy for…

Read More