Skip to content Skip to sidebar Skip to footer

Gas for Gaza Pipeline in Gaza

The specific objectives of this assignment were:  Data gathering – Physical Survey’s and Desktop based Local logistics and arrangements for Expat site visits Local coordination with project stakeholders Support and inputs into the main deliverable reports Reporting on data gathered Supervision of all local visits and survey’s Attend meetings and workshop with clients and various…

Read More

WASH Facilities Design at Jabalia and Beach Camps

The assignment included: The intervention in Abu Rashed stormwater pond located in Jabalia Camp includes the rehabilitation of the drainage system, and increasing the depth of the pond by 1.5 meters, thus expanding the current capacity of the pond from 35,000 m3 to 42,500 m3 besides improving the base and upgrading the electro-mechanical components of…

Read More

Preparation of a Study about Improving Water & Energy Efficiency in Water and Wastewater Facilities

The assignment included conducting a detailed study for improving water and energy efficiency for targeted water and wastewater facilities owned and or operated by selected UPWSP members in Gaza and West Bank, and the outcomes shall be brought forward to the second phase to implement and apply for pilot measures to improve water and energy…

Read More

Assessment on the Affordability, Willingness to Pay, and Tariff Structure for Water and Wastewater Services in Gaza

The overall aim of this study was to assess the affordability and willingness to pay for water and wastewater services in Gaza and determine the necessary adjustments to the tariff structure and billing and collection system in light of ongoing interventions to improve the reliability, quality, and availability of water and wastewater services. The following…

Read More