The assignment included preparing detailed design, bill of quantities, and technical specifications of the proposed projects. The following items represented the main components of the project: New Carrier Line Construction Project in Rafah.
New Carrier Line Construction Project in Abasan All-Kabera
Distribution Water Supply Networks Upgrading Project in 6 Areas in Rafah
Client: JICA
Year…
The project comprised the design of the collection system for Kerbit Al Adas and Al Forkan areas, the design of the Aslan stormwater pond, the preparation of the sewage master plan for Wadi Al Salqa, and the updating of the stormwater master plan for Khan Younis city, in addition to the design of one pumping…
The assignment included providing an update on the status of the drinking water being produced by desalination plants in the Gaza Strip. In essence, this assignment will provide an update to the 2015 report about the Survey of Private and Public Brackish Desalination Plants in the Gaza Strip. The consultant task as summarized below: Updating…
The assignment included the following: Design of a sewage pumping station 500 m3 / day capacity
Design of 2 KM Force main from the PS to the existing sewage system near UNDP roundabout.
Design of 2.5 KM of UPVC pipes and manholes with different diameters Client: Palestinian Water Authority (PWA) Year: 2021-2022
The specific objectives of this assignment were: Data gathering – Physical Survey’s and Desktop based
Local logistics and arrangements for Expat site visits
Local coordination with project stakeholders
Support and inputs into the main deliverable reports
Reporting on data gathered
Supervision of all local visits and survey’s
Attend meetings and workshop with clients and various…
The assignment included:
The intervention in Abu Rashed stormwater pond located in Jabalia Camp includes the rehabilitation of the drainage system, and increasing the depth of the pond by 1.5 meters, thus expanding the current capacity of the pond from 35,000 m3 to 42,500 m3 besides improving the base and upgrading the electro-mechanical components of…