Skip to content Skip to sidebar Skip to footer

Three Pilot Projects – Gaza Strip

The assignment included preparing detailed design, bill of quantities, and technical specifications of the proposed projects. The following items represented the main components of the project: New Carrier Line Construction Project in Rafah. New Carrier Line Construction Project in Abasan All-Kabera Distribution Water Supply Networks Upgrading Project in 6 Areas in Rafah Client: JICA Year…

Read More

Update the Status of the Drinking Water Sector in the Gaza Strip

The assignment included providing an update on the status of the drinking water being produced by desalination plants in the Gaza Strip. In essence, this assignment will provide an update to the 2015 report about the Survey of Private and Public Brackish Desalination Plants in the Gaza Strip. The consultant task as summarized below: Updating…

Read More

Gas for Gaza Pipeline in Gaza

The specific objectives of this assignment were:  Data gathering – Physical Survey’s and Desktop based Local logistics and arrangements for Expat site visits Local coordination with project stakeholders Support and inputs into the main deliverable reports Reporting on data gathered Supervision of all local visits and survey’s Attend meetings and workshop with clients and various…

Read More

WASH Facilities Design at Jabalia and Beach Camps

The assignment included: The intervention in Abu Rashed stormwater pond located in Jabalia Camp includes the rehabilitation of the drainage system, and increasing the depth of the pond by 1.5 meters, thus expanding the current capacity of the pond from 35,000 m3 to 42,500 m3 besides improving the base and upgrading the electro-mechanical components of…

Read More