The assignment utilized and referred to the project’s Feasibility Study and Detailed Design and the Environmental and Social Impact Assessment (ESIA) conducted in 2012, and considered the standard design elements…
The assignment included the detailed design for the overall PV solar energy system at estimated 7 MWp capacity for KY WWTP, phase I, and tender documents for the different phases/packages.…
The assignment included reviewing, redesign and propose needed modifications on the original designs, BOQs, drawings, specifications, cost estimations, design reports and all other tender documents, by utilizing the green building…